TaskMaster.Info

Obsessively documenting the international Taskmaster franchise. Warning: This site is lousy with spoilers!

Hadi builds multiple bridges

Hadi begins to tear apart the model barn, asking Mark if the foundation of the bridge also needs to be made of sand, or just the bridge itself.

He uses pieces of the broken barn to create a small bridge over the river but, when he tests its durability with his finger, to see if it could support the egg, the bridge immediately collapses.

He then appears to find a way to keep the barn bridge sturdy enough to hold some weight, as he is next seen patting down a layer of sand on top of the bridge.

Hadi then decides to build a taller bridge, further down the river, using the small side tables which were supporting the buckets.

This idea eventually morphs into him placing the two small tables at the opposite diagonal corners of the model, and then stacking the buckets on top of them.

The destroyed barn is then placed as a bridge connecting the two buckets, with Hadi replacing the roof of the barn as well as he can.

The roof of the barn has some sand on top of it, and he rests the egg directly in the middle of this.

Hadi is disqualified, however, after it is determined that he did not build a qualifying sand bridge.

(Written by Jenny R and edited by Karl Craven)

Attempt Scores