Build a bridge for the potato
Task types:
Solo
Filmed
Creative
Mental
Objective
Single brief
Adapted
Mastertasks:
Locations:
Task brief
The brief for the task is as follows:
Build a bridge over the stream using only things found on this table.
Tallest bridge wins.
The bridge must support the weight of the potato.
You have 20 minutes.
Your time starts now.
Task notes
- The contestants enter the lab to find a miniature model of the Taskmaster house on the table, featuring a shallow stream, plastic animals, and a potato.
- The items provided on the surface of the table for them to construct a bridge from include matches, drinking straws, uncooked spaghetti, chewing gum, and playing cards.
- There is a button on their side of the table, which lights up a sign on the far side of the table, which reads 'Regarde sous la table' [Look under the table].
- The same text also appears in plain sight above the doorway to the lab, behind them.
- Also, the small boat in the stream on the model has 'Debaixo da mesa' painted on it, which is the same clue in Portuguese.
- Attached to the underside of the table are a pair of scissors, a roll of masking tape, and a number of wooden lollipop sticks.
Task stats
Points
14
Disquals
1
Attempts
Click on the thumbnail images below to read a description of each attempt.
Points
Notes on task scores
- Although the points were to be awarded based on height, Louis factored into his scoring which structures could qualify as actually being bridges.